翻訳と辞書 |
U.S. Army Prime Power Program : ウィキペディア英語版 | U.S. Army Prime Power Program
Through the U.S. Army Prime Power Program, under AR 700-128, the Chief of Engineers is given the responsibility of providing emergency and mobilization, utility-grade electric power to Department of Defense and Federal Agencies. Direction of the Prime Power Program is given to the Commander of the 249th Engineer Battalion (Prime Power) which encompasses the Prime Power School and the Prime Power Generator Program. ==Prime Power Generator Program== The primary purpose of this program is to ensure a mobilization capability exists that provides for the availability of manpower, repair parts and equipment necessary to design, install, operate, maintain and support the PPGP power plants to meet any Department of Defense requirement for prime utility power, not available elsewhere in the Army. Program assets consist of standard and military modified, commercial equipment. During peacetime, the PPGP assets are available for loan to DOD and other U.S. Government departments for a nominal fee to use as backup power, peak shaving and other special or critical electrical requirements, as determined by DOD, the Chief of Engineers or the PPGP Manager. The PPGP is self-sustaining program and managed on a reimbursable basis from annual fees for each generator and per-engine hour charge. Funds received for usage are used to repair and maintain these assets when recovered. Prime Power Specialists from the 249th Engineer Battalion install the equipment and train operators.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「U.S. Army Prime Power Program」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|